Objective
The present project was intended as an extension of the work performed in the TACIS 91-3.5.-Maintenance Project.
Navigation path
Objective
The present project was intended as an extension of the work performed in the TACIS 91-3.5.-Maintenance Project.
Objective
Objective
Objective
This project on Reactor Vessel embrittlement was identified in the very early stage (1991) of the TACIS and PHARE programmes for nuclear safety as a main topic.
Objective
The objective of the project was to study whether the LBB concept can be applied to the piping system of VVER 440/230 and to assess the possibility to achieve, under certain conditions, a high reliability level. More precisely, it was analysed:
Objective
Objective
Mainly for application in the primary loop, VNIIAES has developed a diagnostic centre for:
Objective
Background:
Objective
The project aimed at creating an industrial Fatigue Monitoring System developing the following tasks:
Background
Objective
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment: