Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Navigation path
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
The objective was to replace 430 units of accumulator cells for safety related systems, among them control systems and SCRAM system at Balakovo Nuclear Power Plant.
Result
Objectives
Two prototypes of ECCS-pump (Emergency Core Cooling System) intake filters were designed, supplied and installed in the framework of this project, including the budget of project R1.02/96C.
Objectives
Objective
Objectives
Objective
The project includes procurement of special maintenance equipment for large scale repair and replacement of heavy components like steam generators, pipes and valves.
The envisaged tools and equipment include:
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/96A and jointly tendered, contracted and supplied.
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/95G and jointly tendered, contracted and supplied.
Kalinin Secondary water chemistry
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (I)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (II)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Objective
A general assessment was to be performed on how to improve the medium voltage supply at Kalinin. The assessment should cover medium voltage distribution associated with automation, supervision and cabling.
Deliverables of the assessment:
Background
Background
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
Objective