Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 96 with the same Western and Eastern Utilities and NPPs.
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2013 (1) Apply 2013 filter
- 2012 (3) Apply 2012 filter
- 2011 (4) Apply 2011 filter
- 2010 (2) Apply 2010 filter
- 2009 (3) Apply 2009 filter
- 2008 (6) Apply 2008 filter
- 2007 (5) Apply 2007 filter
- 2006 (6) Apply 2006 filter
- 2005 (3) Apply 2005 filter
- 2004 (1) Apply 2004 filter
- 2003 (2) Apply 2003 filter
- 2002 (1) Apply 2002 filter
- 2001 (6) Apply 2001 filter
- 2000 (1) Apply 2000 filter
- 1999 (2) Apply 1999 filter
- 1998 (2) Apply 1998 filter
- (-) Remove 1997 filter 1997 (16)
- (-) Remove 1996 filter 1996 (16)
- 1995 (7) Apply 1995 filter
- 1994 (13) Apply 1994 filter
- 1993 (6) Apply 1993 filter
- 1992 (8) Apply 1992 filter
- 1991 (8) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- Framatome (2) Apply Framatome filter
- Riskaudit (2) Apply Riskaudit filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (2) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- SGN (Societe generale pour les techniques nouvelles) (2) Apply SGN (Societe generale pour les techniques nouvelles) filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Campenon Bernard (1) Apply Campenon Bernard filter
- Diakont (1) Apply Diakont filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- OKBM Mechanical Engineering (1) Apply OKBM Mechanical Engineering filter
- SEMPELL AG (1) Apply SEMPELL AG filter
- Trischler und Partner (1) Apply Trischler und Partner filter
Contract information field: Sector
Contract information field: Types of activities
- Equipment Supply (7) Apply Equipment Supply filter
- On Site Assistance (4) Apply On Site Assistance filter
- Mitigation of Chernobyl accident (2) Apply Mitigation of Chernobyl accident filter
- Design safety (1) Apply Design safety filter
- Regulatory Authorities (1) Apply Regulatory Authorities filter
- Technical Support Organisations (1) Apply Technical Support Organisations filter
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (10)
- (-) Remove Chernobyl filter Chernobyl (6)
- Zaporozhye (23) Apply Zaporozhye filter
- Kalinin (14) Apply Kalinin filter
- Medzamor (13) Apply Medzamor filter
- South Ukraine (13) Apply South Ukraine filter
- Novovoronezh (11) Apply Novovoronezh filter
- Rovno (11) Apply Rovno filter
- Beloyarsk (8) Apply Beloyarsk filter
- Dukovany (7) Apply Dukovany filter
- Khmelnitsky (6) Apply Khmelnitsky filter
- Kola (5) Apply Kola filter
- Smolensk (5) Apply Smolensk filter
- Kozloduy (4) Apply Kozloduy filter
- Aktau (3) Apply Aktau filter
- Bohunice (3) Apply Bohunice filter
- Leningrad (Sosnovy Bor) (3) Apply Leningrad (Sosnovy Bor) filter
- Paks (2) Apply Paks filter
- Ignalina (1) Apply Ignalina filter
Contract information field: Nature
Contract information field: Method of procurement
Objective
Background
1) Background
Objective
Objective
Background
1) Background
Background
1) Background
Background
6kV circuit breakers originally installed in the units at Balakovo NPP are of the VES-6 type, and the related cabinets are of KE-6 type. Their supplier is Rovno high voltage equipment plant, Ukraine.
Objectives
The project aimed to the modernization of the Fuel Loading Machine (FLM) at Balakovo NPP, in order to meet the machine availability and in compliance with the operation requirements of the NPP.
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Objectives
Two prototypes of ECCS-pump (Emergency Core Cooling System) intake filters were designed, supplied and installed in the framework of this project, including the budget of project R1.02/96C.
Objectives
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/95G and jointly tendered, contracted and supplied.