Objective
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- (-) Remove JRC (Joint Research Centre - European Commission) filter JRC (Joint Research Centre - European Commission) (17)
- (-) Remove Enel filter Enel (2)
- Areva (22) Apply Areva filter
- EDF (Electricite de France) (15) Apply EDF (Electricite de France) filter
- Tecnatom (11) Apply Tecnatom filter
- Belgatom (10) Apply Belgatom filter
- Siemens (10) Apply Siemens filter
- Empresarios Agrupados (9) Apply Empresarios Agrupados filter
- Westinghouse (9) Apply Westinghouse filter
- VTT (Technical Research Centre of Finland) (8) Apply VTT (Technical Research Centre of Finland) filter
- ENAC (European Nuclear Assistance Consortium) (7) Apply ENAC (European Nuclear Assistance Consortium) filter
- IAEA (International Atomic Energy Agency) (7) Apply IAEA (International Atomic Energy Agency) filter
- National Nuclear Corporation (6) Apply National Nuclear Corporation filter
- Riskaudit (6) Apply Riskaudit filter
- BERRY (4) Apply BERRY filter
- Framatome (4) Apply Framatome filter
- IVO Fortum (4) Apply IVO Fortum filter
- Ansaldo Energia (3) Apply Ansaldo Energia filter
- ATOS ORIGIN BELGIUM SA (3) Apply ATOS ORIGIN BELGIUM SA filter
- Fortum (3) Apply Fortum filter
- Iberdrola (3) Apply Iberdrola filter
- Magnox Electric (3) Apply Magnox Electric filter
- Enprima Engineering Oy (2) Apply Enprima Engineering Oy filter
- EWN (Energiewerke Nord) (2) Apply EWN (Energiewerke Nord) filter
- Gidropress (2) Apply Gidropress filter
- GRS (Gesellschaft fur Anlagen und Reaktorsicherheit) (2) Apply GRS (Gesellschaft fur Anlagen und Reaktorsicherheit) filter
- IRSN (Institut de Radioprotection et de Surete Nucleaire) (2) Apply IRSN (Institut de Radioprotection et de Surete Nucleaire) filter
- NRI Rez (2) Apply NRI Rez filter
- RPII (Radiological Protection Institute of Ireland) (2) Apply RPII (Radiological Protection Institute of Ireland) filter
- SERCO (2) Apply SERCO filter
- TES (2) Apply TES filter
- Trischler und Partner (2) Apply Trischler und Partner filter
- TVONS (TVO Nuclear Services Oy) (2) Apply TVONS (TVO Nuclear Services Oy) filter
- UJV Rez (Nuclear Research Institute Rez) (2) Apply UJV Rez (Nuclear Research Institute Rez) filter
- ABB (Asea Brown Boveri) (1) Apply ABB (Asea Brown Boveri) filter
- AMT Group (1) Apply AMT Group filter
- Ansaldo STS (1) Apply Ansaldo STS filter
- BIS (Baltijos Informacines Sistemos) (1) Apply BIS (Baltijos Informacines Sistemos) filter
- British Energy (1) Apply British Energy filter
- BUTE (1) Apply BUTE filter
- Canberra (1) Apply Canberra filter
- Cassiopee (1) Apply Cassiopee filter
- Corys (1) Apply Corys filter
- Electrowatt (1) Apply Electrowatt filter
- OVE ARUP (1) Apply OVE ARUP filter
- SAGE Engineers (1) Apply SAGE Engineers filter
- SKI/SIP (1) Apply SKI/SIP filter
- VEIKI (1) Apply VEIKI filter
- WS ATKINS (1) Apply WS ATKINS filter
Contract information field: Sector
Contract information field: Types of activities
- (-) Remove Safeguards filter Safeguards (16)
- (-) Remove Design safety filter Design safety (3)
- Technical expertise (12) Apply Technical expertise filter
- Fuel Cycle (3) Apply Fuel Cycle filter
- On Site Assistance (2) Apply On Site Assistance filter
- Technical Support Organisations (2) Apply Technical Support Organisations filter
- Training (1) Apply Training filter
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Background
Project Description
Background
Background
This project is a continuation and extension of a previous TACIS project R5.02/96 (see contract 24943 for the relevant background).
Objective
In December 1994 the European Council and the European Parliament considered a proposal from the European Commission to strengthen the co-operation with the Russian Federation in the area of Nuclear Material Accountancy and Control (NMAC).
Background and objective
The project summary will be published after the completion of the project.
At the end of the Project the following specific results are aimed at:
Backround
Background
Background
Background
Background
Background
Objectives
Background
Background
The overall objective of the project was to strengthen non-proliferation regime by enhancing the Safeguards system and in particular the Nuclear Material Accountancy and Control (NMAC).
Project summary will be published after the completion of the project.
The objectives to be achieved during this project are:
• To create within the regional authority ABACC a new safeguard capability enabling the verification of complex plant design and lay-out ("as-is")
Objective
The objective of the project was to improve the existing active fire fighting system, to increase passive and active fire protection and to review secondary effects mitigation of the Novovoronezh and Kola NPPs as first application.