Background
The primary overpressure protection system is designed to protect the reactor equipment and pipelines against primary circuit overpressure phenomena during different transients.
Navigation path
Background
The primary overpressure protection system is designed to protect the reactor equipment and pipelines against primary circuit overpressure phenomena during different transients.
Background
Rovno NPP located in Kuznetsovsk, Rivne Region, Ukraine comprised 4 power units thereof 2 VVER440 type reactors and 2 VVER1000 type reactors.
Objectives
Objective
1. Background
1) Background
The present project is a continuation of on-site-assistance (OSA), rendered by RWE Energy as the EC appointed Consultant to Zaporoshe NPP.
2) Objectives
This project had 2 main different categories of objectives and tasks:
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme”, it was decided to increase the nuclear safety of the units 1 through 6 at the Zaporozhye NPP by improving the protection of the primary circuit from overpressure under normal and emergency modes.
Objectives
Purpose
A comprehensive ISI programme of the Steam Generators will assure their safe and reliable operation in the Armenian NPP with a resultant benefit to the overall Nuclear Safety of the NPP
The objectives of this project were the following:
Objective:
Fire protection equipment shall be delivered with this project, consisting of:
Background
The aim of the Beneficiary (Rosenergoatom) was to minimize personnel, population and environmental radiation impact by means of safety improvement at the existing NPPs, ensuring safety under radioactive waste and spent nuclear materials handling.
Background
Objective
1) Background
In the framework of the improvement of the performance and the enhancement of the engineering capabilities of the nuclear design Kiev Institute "Energoproject" (KIEP), the EC funded some projects to:
Introduction
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 96 with the same Western and Eastern Utility and NPPs.
More information on the outcome of the project is under preparation.
Objective
In the existing fuel loading machines Instrumentation and Control errors in fuel positioning occurred and due to malfunction of the electronics all limiting blockings could run out of function.