Objective
In the existing fuel loading machines Instrumentation and Control errors in fuel positioning occurred and due to malfunction of the electronics all limiting blockings could run out of function.
Navigation path
Objective
In the existing fuel loading machines Instrumentation and Control errors in fuel positioning occurred and due to malfunction of the electronics all limiting blockings could run out of function.
Project background
Objective
The objective of the project was to analyse the current leak rate of the confinement for VVER-230 reactors and consequently to propose how to decrease it drastically.
Objective
Objective