Objective
To perform the conceptual design for a Civil Plutonium (Pu) Storage Facility for 50 T of PuO2 from VVER reactors (civil plutonium) for Nuclear Establishment PO Mayak, Russia, including safeguarding and physical protection aspects.
Navigation path
Objective
To perform the conceptual design for a Civil Plutonium (Pu) Storage Facility for 50 T of PuO2 from VVER reactors (civil plutonium) for Nuclear Establishment PO Mayak, Russia, including safeguarding and physical protection aspects.
1) Background
This project represented a continuation of the project U2.02/93C (see the relevant PRS), when the training centre was designed. Its aim was to continue the creation of the regional Training Centre at Zaporozhe NPP for training of maintenance personnel.
1) Background
This project represented a continuation of the project U2.02/93B and was followed by the project 2.02/94C and 2.01/95 (see the relevant PRSs).
1) Background
Background
This project is the continuation of the project R5.01/94 (see contract 23425).
Objective
The project aimed at creating an industrial Fatigue Monitoring System developing the following tasks:
Objective
R2.04/94 - Water level instrumentation
Objective (see also Project R2.05/94)
Objective
1) Background
This project is the continuation of the project UK/TS/01 A (see the relevant PRS) dedicated to safety assessment of the NPPs at the Rovno site.
Background
Objective
Project Aims
The project objective was to issue PSA reports for Novovoronezh NPP, in particular:
Objectives
Objective
The aim of this project was to enable the Novovoronezh Training Centre (NVVTC) to develop their simulator further in order to provide them with a training facility more adapted to their needs.
Objective
Objective
Objective
The key purpose of Project R2.30/94 is to assess the adequacy of the computational codes used in the reference analysis of the following severe accidents:
Project Aims
The project aimed to establish English Language training for officials.
A proposed teaching plan was established in the Terms of Reference of the contract:
1) Module I consisting of 4 weeks in Ukraine, divided as:
Objectives