Objective RF/RA/04
The objective of this project was:
Navigation path
Objective RF/RA/04
The objective of this project was:
Project BE/RA/02 is a follow-up of project BE/RA/01 with almost the same objectives. The assistance in the field of emergency preparedness including planning and training was included as new objective. This project has 6 technical tasks.
Objective
The objective of this project is to provide technical support by the EU TSOs to the Federal Nuclear Regulatory Authority in Russia during the project preparation phase of its licensing-related activities for the Tacis funded On-Site-Assistance Projects.
1) Background
Objectives
This project constituted a follow-up of the two previous ANRA technical support actions (AR/TS/01 and AR/TS/02).
Objectives
Objectives
1) Background
Objectives
Please refer to contract 27775
UK/TS/28 is a 2+2 project in which EU Technical Support Organisations support the Ukrainian Nuclear Safety Authority (SNRCU) in its activities on licensing related assessments of EU financed improvement measures in Zaporozhye NPP.
UK/TS/29 was a technical support project in which the nuclear safety authority of Ukraine (SNRCU) was supported in reviewing safety documentation, mainly related to Khmelnitsky 2 and Rovno 4 (K2R4).
Objective
Background
The primary objective of this project was to strengthen and support the national nuclear safety regulatory system in Ukraine by promoting the integration of European Union (EU) regulatory practice. The project was considered successful in this respect.
UK/TS/31 was a 2+2 project, for support to the nuclear safety regulator of Ukraine (SNRCU) in the assessment of EU financed safety improvements within industrial project U1.04/03 "Upgrading of electrical equipment of reactor control and protection system and neutron flux monitoring equipment on K
UK/TS/32 was a technical support project including 2+2 tasks, for support to the nuclear safety regulator of Ukraine (SNRCU). It included 11 technical tasks mainly related to remaining modernisation steps of Khmelnitsky 2 and Rovno 4 (K2R4).
This project was the follow-up of projects BE/RA/01 and BE/RA/02.
The objective of the contract is to support SNRCU and its TSO in the review of the Safety Analysis Reports and to strengthen the capabilities of the SNRCU and of its local technical safety organisation SSTC by transferring Western practice and extension of the capabilities of the SNRCU.
The purpose of this contract has several components: