Objective:
Fire protection equipment shall be delivered with this project, consisting of:
Navigation path
Objective:
Fire protection equipment shall be delivered with this project, consisting of:
Background
The aim of the Beneficiary (Rosenergoatom) was to minimize personnel, population and environmental radiation impact by means of safety improvement at the existing NPPs, ensuring safety under radioactive waste and spent nuclear materials handling.
Background
Objective
Introduction
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 96 with the same Western and Eastern Utility and NPPs.
More information on the outcome of the project is under preparation.
Objective
In the existing fuel loading machines Instrumentation and Control errors in fuel positioning occurred and due to malfunction of the electronics all limiting blockings could run out of function.
Objective
To perform the conceptual design for a Civil Plutonium (Pu) Storage Facility for 50 T of PuO2 from VVER reactors (civil plutonium) for Nuclear Establishment PO Mayak, Russia, including safeguarding and physical protection aspects.
Background
This project is the continuation of the project R5.01/94 (see contract 23425).
Objective
The project aimed at creating an industrial Fatigue Monitoring System developing the following tasks:
Objective
R2.04/94 - Water level instrumentation
Objective (see also Project R2.05/94)
Objective
Background
Objective
Project Aims
The project objective was to issue PSA reports for Novovoronezh NPP, in particular:
Objectives
Objective
The aim of this project was to enable the Novovoronezh Training Centre (NVVTC) to develop their simulator further in order to provide them with a training facility more adapted to their needs.
Objective