Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2013 (1) Apply 2013 filter
- 2011 (1) Apply 2011 filter
- 2008 (1) Apply 2008 filter
- 2007 (1) Apply 2007 filter
- 2006 (3) Apply 2006 filter
- 2005 (9) Apply 2005 filter
- 2004 (5) Apply 2004 filter
- 2003 (11) Apply 2003 filter
- 2002 (7) Apply 2002 filter
- (-) Remove 2000 filter 2000 (30)
- 1999 (2) Apply 1999 filter
- 1998 (2) Apply 1998 filter
- 1997 (10) Apply 1997 filter
- 1996 (29) Apply 1996 filter
- (-) Remove 1995 filter 1995 (30)
- 1994 (33) Apply 1994 filter
- 1993 (24) Apply 1993 filter
- (-) Remove 1992 filter 1992 (30)
- 1991 (28) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- Areva (5) Apply Areva filter
- TechniData (3) Apply TechniData filter
- Tecnatom (3) Apply Tecnatom filter
- BERRY (2) Apply BERRY filter
- EDF (Electricite de France) (2) Apply EDF (Electricite de France) filter
- ENAC (European Nuclear Assistance Consortium) (2) Apply ENAC (European Nuclear Assistance Consortium) filter
- UNIT EXPORT (2) Apply UNIT EXPORT filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Balfour Williamson (1) Apply Balfour Williamson filter
- Belgatom (1) Apply Belgatom filter
- CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH (1) Apply CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH filter
- CIT (1) Apply CIT filter
- Empresarios Agrupados (1) Apply Empresarios Agrupados filter
- FM Consultants Associates (1) Apply FM Consultants Associates filter
- JRC (Joint Research Centre - European Commission) (1) Apply JRC (Joint Research Centre - European Commission) filter
- Kraftanlagen (1) Apply Kraftanlagen filter
- National Nuclear Corporation (1) Apply National Nuclear Corporation filter
- VTT (Technical Research Centre of Finland) (1) Apply VTT (Technical Research Centre of Finland) filter
Contract information field: Sector
- (-) Remove DS - Design safety (incl. Off-Site Emergency Preparedness) filter DS - Design safety (incl. Off-Site Emergency Preparedness) (30)
- HI - Horizontal Issues (31) Apply HI - Horizontal Issues filter
- RA - Regulatory Authorities (19) Apply RA - Regulatory Authorities filter
- WDS - Waste, Decommissioning and Safeguards (15) Apply WDS - Waste, Decommissioning and Safeguards filter
- OSA - On Site Assistance (1) Apply OSA - On Site Assistance filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Project Aims
The objective of the project consisted in delivering and installing communication equipment in order to improve the communication for Off-site Emergency preparedness in Kazakhstan and Ukraine.
Background
Background
Background
Specific objective
Objective
This project is the continuation of the Tacis 1991 project 3.8 for performing additional Severe Accident (SA) analysis of VVER 1000 scenarios with available SA codes, especially for supporting Tacis 1991 project 3.1.
Objectives
Project background
Project background
Objective
Objective
Objective
Objective
Development of training material for NPP Training Points located at NPP sites for On the Job Training (OJT) with the methodology used to implement the material for the Training Centres (refer to TACIS 1.8 and TACIS 4.1).
1) Background
In the framework of the improvement of the performance and the enhancement of the engineering capabilities of the nuclear design Kiev Institute "Energoproject" (KIEP), the EC funded some projects to:
Objectives:
Design background
Currently, there are 16 VVER-440/V213 reactors operating in the Czech Republic, Hungary, Russian Federation, Ukraine and Slovak Republic.
Objective
The overall project aimed to develop and deliver simulation tools to be installed on the VVER-440-NPP sites (230/213). Multifunctional Simulators (MFS) had to be supplied and delivered to Novoronezh Training Centre and Kola NPP.
Objective
The Beneficiary requested spare parts for In-Service-Inspection Equipment, which has been delivered by a Western Company in the last 20 years to the Soviet Union.
An extensive list of parts to be purchased has been set up by the Beneficiary.
Objective