Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2013 (1) Apply 2013 filter
- 2011 (1) Apply 2011 filter
- 2008 (1) Apply 2008 filter
- 2007 (1) Apply 2007 filter
- 2006 (3) Apply 2006 filter
- 2005 (9) Apply 2005 filter
- 2004 (5) Apply 2004 filter
- 2003 (11) Apply 2003 filter
- 2002 (7) Apply 2002 filter
- (-) Remove 2000 filter 2000 (53)
- 1999 (2) Apply 1999 filter
- 1998 (2) Apply 1998 filter
- 1997 (10) Apply 1997 filter
- 1996 (29) Apply 1996 filter
- (-) Remove 1995 filter 1995 (53)
- (-) Remove 1994 filter 1994 (53)
- 1993 (24) Apply 1993 filter
- 1992 (10) Apply 1992 filter
- 1991 (28) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- Areva (8) Apply Areva filter
- Tecnatom (5) Apply Tecnatom filter
- BERRY (3) Apply BERRY filter
- CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH (3) Apply CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH filter
- EDF (Electricite de France) (3) Apply EDF (Electricite de France) filter
- Empresarios Agrupados (3) Apply Empresarios Agrupados filter
- TechniData (3) Apply TechniData filter
- VTT (Technical Research Centre of Finland) (3) Apply VTT (Technical Research Centre of Finland) filter
- Belgatom (2) Apply Belgatom filter
- Siemens (2) Apply Siemens filter
- UNIT EXPORT (2) Apply UNIT EXPORT filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- ATOS ORIGIN BELGIUM SA (1) Apply ATOS ORIGIN BELGIUM SA filter
- ENCO - Enconet (1) Apply ENCO - Enconet filter
- Enel (1) Apply Enel filter
- Enprima Engineering Oy (1) Apply Enprima Engineering Oy filter
- EWN (Energiewerke Nord) (1) Apply EWN (Energiewerke Nord) filter
- FM Consultants Associates (1) Apply FM Consultants Associates filter
- Framatome (1) Apply Framatome filter
- Gea Wenutec (1) Apply Gea Wenutec filter
- JRC (Joint Research Centre - European Commission) (1) Apply JRC (Joint Research Centre - European Commission) filter
- Kraftanlagen (1) Apply Kraftanlagen filter
- Magnox Electric (1) Apply Magnox Electric filter
- PA Consulting Group (1) Apply PA Consulting Group filter
- RASMUSSEN (1) Apply RASMUSSEN filter
- THALES (1) Apply THALES filter
- Trischler und Partner (1) Apply Trischler und Partner filter
Contract information field: Sector
- (-) Remove DS - Design safety (incl. Off-Site Emergency Preparedness) filter DS - Design safety (incl. Off-Site Emergency Preparedness) (53)
- WDS - Waste, Decommissioning and Safeguards (31) Apply WDS - Waste, Decommissioning and Safeguards filter
- HI - Horizontal Issues (26) Apply HI - Horizontal Issues filter
- RA - Regulatory Authorities (23) Apply RA - Regulatory Authorities filter
- OSA - On Site Assistance (2) Apply OSA - On Site Assistance filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
- Rosenergoatom (12) Apply Rosenergoatom filter
- Armenian Nuclear Power Plant (1) Apply Armenian Nuclear Power Plant filter
- Chernobyl NPP (1) Apply Chernobyl NPP filter
- GOSKOMATOM (1) Apply GOSKOMATOM filter
- Kiev Institute Energoproject (1) Apply Kiev Institute Energoproject filter
- Sevastopol Institute of Nuclear Energy and Industry (SINEI) (1) Apply Sevastopol Institute of Nuclear Energy and Industry (SINEI) filter
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Project Aims
The objective of the project consisted in delivering and installing communication equipment in order to improve the communication for Off-site Emergency preparedness in Kazakhstan and Ukraine.
Background
Background
Background
Specific objective
Objective
The objective was to deliver the following items:
Objective
Background
The accident at the Chernobyl Nuclear Power Plant in Ukraine in April 1986 demonstrated the need for adequate radiation early warning systems that allow authorities to take appropriate and timely actions in the event of a major radiological accident.
Background
The accident at the Chernobyl Nuclear Power Plant in Ukraine in April 1986 demonstrated the need for adequate radiation early warning systems that allow authorities to take appropriate and timely actions in the event of a major radiological accident.
Objective
This project is the continuation of the Tacis 1991 project 3.8 for performing additional Severe Accident (SA) analysis of VVER 1000 scenarios with available SA codes, especially for supporting Tacis 1991 project 3.1.
Objectives
Project background
Project background
Objective
Objective
Objective
Objective
Development of training material for NPP Training Points located at NPP sites for On the Job Training (OJT) with the methodology used to implement the material for the Training Centres (refer to TACIS 1.8 and TACIS 4.1).
1) Background
In the framework of the improvement of the performance and the enhancement of the engineering capabilities of the nuclear design Kiev Institute "Energoproject" (KIEP), the EC funded some projects to:
Objectives: