Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2013 (1) Apply 2013 filter
- 2011 (1) Apply 2011 filter
- 2008 (1) Apply 2008 filter
- 2007 (1) Apply 2007 filter
- 2006 (3) Apply 2006 filter
- 2005 (9) Apply 2005 filter
- 2004 (5) Apply 2004 filter
- 2003 (11) Apply 2003 filter
- 2002 (7) Apply 2002 filter
- (-) Remove 2000 filter 2000 (49)
- 1999 (2) Apply 1999 filter
- 1998 (2) Apply 1998 filter
- 1997 (10) Apply 1997 filter
- (-) Remove 1996 filter 1996 (49)
- (-) Remove 1995 filter 1995 (49)
- 1994 (33) Apply 1994 filter
- 1993 (24) Apply 1993 filter
- 1992 (10) Apply 1992 filter
- 1991 (28) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- Tecnatom (7) Apply Tecnatom filter
- Areva (6) Apply Areva filter
- EDF (Electricite de France) (5) Apply EDF (Electricite de France) filter
- CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH (3) Apply CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH filter
- TechniData (3) Apply TechniData filter
- Ansaldo Energia (2) Apply Ansaldo Energia filter
- ATOS ORIGIN BELGIUM SA (2) Apply ATOS ORIGIN BELGIUM SA filter
- Belgatom (2) Apply Belgatom filter
- National Nuclear Corporation (2) Apply National Nuclear Corporation filter
- UNIT EXPORT (2) Apply UNIT EXPORT filter
- ABB (Asea Brown Boveri) (1) Apply ABB (Asea Brown Boveri) filter
- AEP (Atomenergoproekt) (1) Apply AEP (Atomenergoproekt) filter
- BERRY (1) Apply BERRY filter
- Empresarios Agrupados (1) Apply Empresarios Agrupados filter
- ENCO - Enconet (1) Apply ENCO - Enconet filter
- EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM (1) Apply EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM filter
- EWN (Energiewerke Nord) (1) Apply EWN (Energiewerke Nord) filter
- FM Consultants Associates (1) Apply FM Consultants Associates filter
- JRC (Joint Research Centre - European Commission) (1) Apply JRC (Joint Research Centre - European Commission) filter
- Kraftanlagen (1) Apply Kraftanlagen filter
- Luxconsult (1) Apply Luxconsult filter
- Magnox Electric (1) Apply Magnox Electric filter
- Siemens (1) Apply Siemens filter
- STUK (Sateilyturvakeskus) (1) Apply STUK (Sateilyturvakeskus) filter
- VTT (Technical Research Centre of Finland) (1) Apply VTT (Technical Research Centre of Finland) filter
Contract information field: Sector
- (-) Remove DS - Design safety (incl. Off-Site Emergency Preparedness) filter DS - Design safety (incl. Off-Site Emergency Preparedness) (49)
- HI - Horizontal Issues (35) Apply HI - Horizontal Issues filter
- WDS - Waste, Decommissioning and Safeguards (32) Apply WDS - Waste, Decommissioning and Safeguards filter
- RA - Regulatory Authorities (27) Apply RA - Regulatory Authorities filter
- EXT - not Nuclear Safety (1) Apply EXT - not Nuclear Safety filter
- OSA - On Site Assistance (1) Apply OSA - On Site Assistance filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Project Aims
The objective of the project consisted in delivering and installing communication equipment in order to improve the communication for Off-site Emergency preparedness in Kazakhstan and Ukraine.
Background
Background
Background
Specific objective
Overall objective(s):
The completion and safety upgrading of Rovno-4 and Khmelnitskiy-2 units.
Objective
This project is the continuation of the Tacis 1991 project 3.8 for performing additional Severe Accident (SA) analysis of VVER 1000 scenarios with available SA codes, especially for supporting Tacis 1991 project 3.1.
Objectives
Background
This second contract was placed to extend the scope of the project U2.05/94 (see 23160 for a description of the first contract).
Objective
Objective
When assessing the NPPs operation safety level, one of the major elements is the residual lifetime of equipment and components. Continuous operation of the NPPs for power generation leads mainly to:
Brief project history
Objective
Objective
The training programme for the management of the NPPs/Nuclear Facilities included:
Objective
The project aim is to implement an expertise methodology on a pilot NPP in order to evaluate the status of the electrical cabling and residual lifetime.
Following related activities are to be performed:
Objective
The Project is based on the use of Western technology, software and hardware received in the frame of TACIS 91 - 1.3. Project Accident analysis.
The objectives were:
Objectives
Objective
The present project was proposed as a result of the Brainstorming meeting held at Garching (Germany) February 2 and 3, 1995 and in full consideration of the safety relevance of the RPV integrity issue.
Objective
The structural integrity of RBMK fuel channels and their interaction with the Graphite blocks governs the safe lifetime of the reactor core.