Full title of the project
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB concept of the primary circuit including the surge line at the Unit 2 of ANPP.
Navigation path
Full title of the project
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB concept of the primary circuit including the surge line at the Unit 2 of ANPP.
Only general contract information avail
Background
Total Cost € 295,335.00
EU contribution € 96,096.00
Only general contract information available.
Project Aims
Background
Background
Background
Project Description
Project Description
Background
Background
This project was implemented through three separate contracts:
Background
This project was implemented through three separate contracts:
Introduction
Objective
This project aimed at replacing the obsolete radiological Instrumentation and increase capability of the plant radiation monitoring system.
Result
Background