Objective
The objective of the present project was to perform a limited integrity assessment of the VVER 1000 Reactor Pressure Vessel (RPV) taking into account the irradiation embrittlement effect.
The project covered four major areas:
Navigation path
Objective
The objective of the present project was to perform a limited integrity assessment of the VVER 1000 Reactor Pressure Vessel (RPV) taking into account the irradiation embrittlement effect.
The project covered four major areas:
1)Background
Objectives
Objective
The objective of this project was to assist the GAN-RF and Russian TSOs in reviewing and assessing the accident analysis performed for units 1 and 2 of Kola NPP within project TACIS-91-1.3, further referred to as Industrial Project.
Introduction
Objective
This project aimed at replacing the obsolete radiological Instrumentation and increase capability of the plant radiation monitoring system.
Result
Objective
Background
Objective
Objective
Objective
Background
Objective
Bilibino NPP
Bilibino nuclear power and district heating plant (NPDHP) was the first nuclear power station built beyond the Polar Circle in the central part of the Chukotka peninsula, and it provides electricity for the regional mining and gold mining industries.
Objectives
In the framework of the “Tacis Nuclear Safety Programme” it was decided to provide technical assistance and hardware for the radiological characterisation and monitoring of the Aktau NPP (BN-350, fast breeder). The project covered the following lots:
Bilibino NPP