Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Navigation path
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 94 with the same Western and Eastern Utility and NPPs.
Objective
Objective
A simulator was to be provided for instruction and proficiency training of operator teams to improve their skills and knowledge.
The simulator had to provide the following types of training:
Objectives:
Objective
Objective
Application of the LBB Concept on VVER-440/230 Primary Circuit
Objective
Objective
On request of the Beneficiary a simulator (see Project R1.06/93) was provided for instruction and proficiency training of operator teams to improve their skills and knowledge to operate the BN 600 NPP at Beloyarsk.
Objectives
Objective (phase 2)
The objective of this project was to continue the work started in a first phase under the same project number. This project is to be seen as a contractual extension of the previous one with the same number R1.06/7/92.
Result
Objective
This On-Site-Assistance (OSA) project is dealing with the increase of the safety culture on the NPP. As in all other cases, the OSA was performed by an EU utility working with team of Western and Russian experts.
General purpose of the OSA: