Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Search
Contract information field: Programme
Contract information field: Country
- (-) Remove Kazakhstan filter Kazakhstan (8)
- (-) Remove Argentina filter Argentina (1)
- Ukraine (64) Apply Ukraine filter
- Russia (56) Apply Russia filter
- Czech Republic (19) Apply Czech Republic filter
- Slovakia (14) Apply Slovakia filter
- Hungary (10) Apply Hungary filter
- Bulgaria (7) Apply Bulgaria filter
- China (5) Apply China filter
- European Union (5) Apply European Union filter
- Armenia (2) Apply Armenia filter
- Belarus (2) Apply Belarus filter
- Latvia (2) Apply Latvia filter
- Lithuania (2) Apply Lithuania filter
- Slovenia (2) Apply Slovenia filter
- Brazil (1) Apply Brazil filter
- Estonia (1) Apply Estonia filter
- Iraq (1) Apply Iraq filter
- Kyrgyzstan (1) Apply Kyrgyzstan filter
- Mongolia (1) Apply Mongolia filter
- Tajikistan (1) Apply Tajikistan filter
Contract information field: Budget year
- 2014 (1) Apply 2014 filter
- 2013 (2) Apply 2013 filter
- (-) Remove 2011 filter 2011 (9)
- 2010 (2) Apply 2010 filter
- 2009 (1) Apply 2009 filter
- 2008 (1) Apply 2008 filter
- 2005 (1) Apply 2005 filter
- 2004 (3) Apply 2004 filter
- 2003 (1) Apply 2003 filter
- 2002 (1) Apply 2002 filter
- 2001 (1) Apply 2001 filter
- 2000 (1) Apply 2000 filter
- 1998 (4) Apply 1998 filter
- 1997 (7) Apply 1997 filter
- 1996 (6) Apply 1996 filter
- (-) Remove 1995 filter 1995 (9)
- 1994 (6) Apply 1994 filter
- 1993 (4) Apply 1993 filter
Contract information field: Status
Contract information field: Contractor
- Alstom (2) Apply Alstom filter
- Carl Zeiss (1) Apply Carl Zeiss filter
- Deutsche Exide StanBy (1) Apply Deutsche Exide StanBy filter
- European Procurement Agents en SPRL (1) Apply European Procurement Agents en SPRL filter
- Italtrend (1) Apply Italtrend filter
- JRC (Joint Research Centre - European Commission) (1) Apply JRC (Joint Research Centre - European Commission) filter
- Lloyd Instruments (1) Apply Lloyd Instruments filter
- Roeii Amsier (1) Apply Roeii Amsier filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme”, it was decided to improve the passive fire protection facilities of the BN-350 NPP (fast breeder) in Aktau, Kazakhstan. The project was divided into three lots:
Project summary will be published after the completion of the project.
The objectives to be achieved during this project are:
• To create within the regional authority ABACC a new safeguard capability enabling the verification of complex plant design and lay-out ("as-is")