Objective
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2009 (1) Apply 2009 filter
- 2007 (1) Apply 2007 filter
- 2006 (2) Apply 2006 filter
- 2005 (3) Apply 2005 filter
- 2003 (2) Apply 2003 filter
- 2002 (5) Apply 2002 filter
- 2001 (4) Apply 2001 filter
- 2000 (1) Apply 2000 filter
- 1999 (2) Apply 1999 filter
- 1998 (9) Apply 1998 filter
- 1997 (10) Apply 1997 filter
- 1996 (13) Apply 1996 filter
- 1995 (10) Apply 1995 filter
- (-) Remove 1994 filter 1994 (19)
- 1993 (6) Apply 1993 filter
- 1992 (20) Apply 1992 filter
Contract information field: Status
Contract information field: Contractor
- Framatome (2) Apply Framatome filter
- Brühl&Kjaer (1) Apply Brühl&Kjaer filter
- CITA (1) Apply CITA filter
- Cotecna (1) Apply Cotecna filter
- DataLoop (1) Apply DataLoop filter
- EFCO (1) Apply EFCO filter
- IBS (1) Apply IBS filter
- Lamport (1) Apply Lamport filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- NERSA (Centrale Nucleaire Europeenne a Neutrons Rapides) (1) Apply NERSA (Centrale Nucleaire Europeenne a Neutrons Rapides) filter
- NIS Rheinsberg (1) Apply NIS Rheinsberg filter
- Riskaudit (1) Apply Riskaudit filter
- Schneider Electric (1) Apply Schneider Electric filter
- SEBIM (1) Apply SEBIM filter
- Seres (1) Apply Seres filter
- Taprogge (1) Apply Taprogge filter
- Tecnatom (1) Apply Tecnatom filter
- Waters (1) Apply Waters filter
Contract information field: Sector
Contract information field: Types of activities
- Equipment Supply (13) Apply Equipment Supply filter
- Design safety (1) Apply Design safety filter
- Euratom Loan Preparation (1) Apply Euratom Loan Preparation filter
- On Site Assistance (1) Apply On Site Assistance filter
- Technical Support Organisations (1) Apply Technical Support Organisations filter
- Training (1) Apply Training filter
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Kalinin filter Kalinin (15)
- (-) Remove Beloyarsk filter Beloyarsk (3)
- (-) Remove Ignalina filter Ignalina (1)
- Novovoronezh (11) Apply Novovoronezh filter
- South Ukraine (11) Apply South Ukraine filter
- Zaporozhye (11) Apply Zaporozhye filter
- Balakovo (10) Apply Balakovo filter
- Kola (8) Apply Kola filter
- Paks (6) Apply Paks filter
- Smolensk (6) Apply Smolensk filter
- Aktau (5) Apply Aktau filter
- Dukovany (5) Apply Dukovany filter
- Bohunice (4) Apply Bohunice filter
- Rovno (4) Apply Rovno filter
- Chernobyl (3) Apply Chernobyl filter
- Leningrad (Sosnovy Bor) (3) Apply Leningrad (Sosnovy Bor) filter
- Medzamor (2) Apply Medzamor filter
- Temelin (2) Apply Temelin filter
- Kozloduy (1) Apply Kozloduy filter
- Mochovce (1) Apply Mochovce filter
Contract information field: Nature
Contract information field: Method of procurement
Objectives
Kalinin Secondary water chemistry
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (I)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (II)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Objective
A general assessment was to be performed on how to improve the medium voltage supply at Kalinin. The assessment should cover medium voltage distribution associated with automation, supervision and cabling.
Deliverables of the assessment:
Background
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
Objective
Objective
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 94 with the same Western and Eastern Utility and NPPs.
Objective
The objective was to deliver the following items:
Objective
The aim of the project is the replacement of the 8 existing safety valves on one Unit on the steam generators by modern Western safety valves.
Result
Summary
Objective
Objectives
The objective of this project was to provide the Commission with an independent expert evaluation whether the upgraded Kalinin NPP unit 3 would be in line with European safety objectives and practices.
Project