Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
Navigation path
Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
See projects R1.06/97D and�R1.06/96B
Objective
Objective
Objectives
Background
Background
Objective
Objective
The objective of the project is to equip the BN 600 NPP with hardware, software and procedures for thermal visual inspection of the high voltage equipment for timely prevention of the accidents at the BN 600 NPP.
Beloyarsk Process Monitoring System (see projects R1.06/95E and R1.06/96B)
1) Background
The IAEA identified through the comprehensive safety assessment of VVER-1000 reactors that the existing DC supply, in particular batteries to be a safety issue because of the following:
Background
1) Background
Objective
The aim of the project is the refurbishment of the present Process Monitoring System (PMS) with full consideration of the possibility to operate with PMS functions in the present as well as in the new system.
Project Background
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 94 with the same Western and Eastern Utility and NPPs.
1) Background
This contract covers the standard OSA type support to a nuclear plant in Ukraine, in the framework of the TACIS project system. It covered the years 1997 (partially) – 2003.
2)Objectives
Objective
A simulator was to be provided for instruction and proficiency training of operator teams to improve their skills and knowledge.
The simulator had to provide the following types of training: