Objective R1.02/93
This “On-Site-Assistance”, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases, the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- EDF (Electricite de France) (11) Apply EDF (Electricite de France) filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (7) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- RE (Rheinisch-Westfälisches Elektrizitätswerk) (3) Apply RE (Rheinisch-Westfälisches Elektrizitätswerk) filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- ENVINET (1) Apply ENVINET filter
- Nukem (1) Apply Nukem filter
- Onet Technologies (1) Apply Onet Technologies filter
- SOGIN (Societa Gestione Impianti Nucleari) (1) Apply SOGIN (Societa Gestione Impianti Nucleari) filter
Contract information field: Types of activities
- (-) Remove On Site Assistance filter On Site Assistance (26)
- Equipment Supply (48) Apply Equipment Supply filter
- Design safety (3) Apply Design safety filter
- Technical Support Organisations (3) Apply Technical Support Organisations filter
- Regulatory Authorities (1) Apply Regulatory Authorities filter
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Rovno filter Rovno (16)
- (-) Remove Balakovo filter Balakovo (9)
- (-) Remove Bilibino filter Bilibino (1)
- Smolensk (18) Apply Smolensk filter
- Kozloduy (17) Apply Kozloduy filter
- Zaporozhye (17) Apply Zaporozhye filter
- Medzamor (16) Apply Medzamor filter
- Kola (13) Apply Kola filter
- Beloyarsk (12) Apply Beloyarsk filter
- South Ukraine (12) Apply South Ukraine filter
- Novovoronezh (11) Apply Novovoronezh filter
- Dukovany (10) Apply Dukovany filter
- Kalinin (10) Apply Kalinin filter
- Khmelnitsky (9) Apply Khmelnitsky filter
- Leningrad (Sosnovy Bor) (9) Apply Leningrad (Sosnovy Bor) filter
- Bohunice (8) Apply Bohunice filter
- Aktau (6) Apply Aktau filter
- Paks (3) Apply Paks filter
- Chernobyl (2) Apply Chernobyl filter
- Cernavoda (1) Apply Cernavoda filter
- Krsko (1) Apply Krsko filter
Contract information field: Nature
Contract information field: Method of procurement
1) Background
Background
1) Background
Bilibino NPP
Bilibino nuclear power and district heating plant (NPDHP) was the first nuclear power station built beyond the Polar Circle in the central part of the Chukotka peninsula, and it provides electricity for the regional mining and gold mining industries.
1) Background
Background
Rovno NPP located in Kuznetsovsk, Rivne Region, Ukraine comprised 4 power units thereof 2 VVER440 type reactors and 2 VVER1000 type reactors.
Background
Due to a backlog of several Tacis equipment supply projects for Balakovo NPP, caused by external factors, there was an urgent need to make provisions for the proper follow-up of these projects.
Background
U1.01/98 & U1.01/98A
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Rovno NPP.
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Rovno NPP.
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 96 with the same Western and Eastern Utilities and NPPs.
1) Background
This contract is for the the design, manufacture, delivery, etc.
Objective
In the existing fuel loading machines Instrumentation and Control errors in fuel positioning occurred and due to malfunction of the electronics all limiting blockings could run out of function.
Project Description (to be included in the Database)
The aims of the On-Site Assistance at the RNPP have been:
1. to improve operational safety culture of the RNPP (Soft OSA) through general On-Site Assistance to RNPP eg.
U1.01/95 - Phase 3