Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
Navigation path
Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
See projects R1.06/97D and�R1.06/96B
Objective
Objective
Objective
Objectives
Background
Background
Objective
Objective
The objective of the project is to equip the BN 600 NPP with hardware, software and procedures for thermal visual inspection of the high voltage equipment for timely prevention of the accidents at the BN 600 NPP.
Beloyarsk Process Monitoring System (see projects R1.06/95E and R1.06/96B)
Objective
The aim of the project is the refurbishment of the present Process Monitoring System (PMS) with full consideration of the possibility to operate with PMS functions in the present as well as in the new system.
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Objective
Objective
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment: