Objective
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
- (-) Remove Closed filter Closed (28)
Contract information field: Contractor
- RRCKI ( Russian Research Centre Kurchatov Institute) (5) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- Framatome (3) Apply Framatome filter
- Bosch (2) Apply Bosch filter
- Data Systems & Solutions (2) Apply Data Systems & Solutions filter
- OKBM Mechanical Engineering (2) Apply OKBM Mechanical Engineering filter
- Siemens (2) Apply Siemens filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- BALTIJOS INFORMACINES SISTEMOS UAB (1) Apply BALTIJOS INFORMACINES SISTEMOS UAB filter
- Diakont (1) Apply Diakont filter
- Elektrogorsk Research and Engineering Center on NPP Safety (1) Apply Elektrogorsk Research and Engineering Center on NPP Safety filter
- MICA (1) Apply MICA filter
- RE (Rheinisch-Westfälisches Elektrizitätswerk) (1) Apply RE (Rheinisch-Westfälisches Elektrizitätswerk) filter
- Schneider Electric (1) Apply Schneider Electric filter
- SEBIM (1) Apply SEBIM filter
- SEMPELL AG (1) Apply SEMPELL AG filter
- Technoserv (1) Apply Technoserv filter
- Varta (1) Apply Varta filter
- VHB Germany (1) Apply VHB Germany filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
- (-) Remove Rosenergoatom filter Rosenergoatom (28)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (26)
- (-) Remove Bilibino filter Bilibino (2)
- Kalinin (44) Apply Kalinin filter
- Novovoronezh (32) Apply Novovoronezh filter
- Kola (23) Apply Kola filter
- Beloyarsk (22) Apply Beloyarsk filter
- Smolensk (20) Apply Smolensk filter
- Leningrad (Sosnovy Bor) (13) Apply Leningrad (Sosnovy Bor) filter
Contract information field: Nature
Contract information field: Method of procurement
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
The objective was to replace 430 units of accumulator cells for safety related systems, among them control systems and SCRAM system at Balakovo Nuclear Power Plant.
Result
Objectives
Two prototypes of ECCS-pump (Emergency Core Cooling System) intake filters were designed, supplied and installed in the framework of this project, including the budget of project R1.02/96C.
Objectives
Objective
Objectives
Objective
The project includes procurement of special maintenance equipment for large scale repair and replacement of heavy components like steam generators, pipes and valves.
The envisaged tools and equipment include:
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/96A and jointly tendered, contracted and supplied.
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/95G and jointly tendered, contracted and supplied.
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Introduction
Objectives
The project aimed to the modernization of the Fuel Loading Machine (FLM) at Balakovo NPP, in order to meet the machine availability and in compliance with the operation requirements of the NPP.
Objective R1.02/93
This “On-Site-Assistance”, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases, the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Objective
Background
Balakovo Nuclear Power Plant has four units completed and in operation; all units are of the VVER 1000-V320 type.
Bilibino NPP
Bilibino nuclear power and district heating plant (NPDHP) was the first nuclear power station built beyond the Polar Circle in the central part of the Chukotka peninsula, and it provides electricity for the regional mining and gold mining industries.