1) Background
The IAEA identified through the comprehensive safety assessment of VVER-1000 reactors that the existing DC supply, in particular batteries to be a safety issue because of the following:
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- Alstom (2) Apply Alstom filter
- EFCO (2) Apply EFCO filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Brühl&Kjaer (1) Apply Brühl&Kjaer filter
- Canberra (1) Apply Canberra filter
- Carl Zeiss (1) Apply Carl Zeiss filter
- Deutsche Exide StanBy (1) Apply Deutsche Exide StanBy filter
- Lloyd Instruments (1) Apply Lloyd Instruments filter
- Mitsui Babcock (1) Apply Mitsui Babcock filter
- Radiy (1) Apply Radiy filter
- Roeii Amsier (1) Apply Roeii Amsier filter
- UNIT EXPORT (1) Apply UNIT EXPORT filter
- VHB Germany (1) Apply VHB Germany filter
- VTN (1) Apply VTN filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Aktau filter Aktau (11)
- (-) Remove Khmelnitsky filter Khmelnitsky (5)
- Zaporozhye (72) Apply Zaporozhye filter
- South Ukraine (52) Apply South Ukraine filter
- Kalinin (42) Apply Kalinin filter
- Balakovo (29) Apply Balakovo filter
- Medzamor (26) Apply Medzamor filter
- Rovno (21) Apply Rovno filter
- Novovoronezh (20) Apply Novovoronezh filter
- Kola (18) Apply Kola filter
- Beloyarsk (17) Apply Beloyarsk filter
- Smolensk (16) Apply Smolensk filter
- Leningrad (Sosnovy Bor) (7) Apply Leningrad (Sosnovy Bor) filter
- Chernobyl (4) Apply Chernobyl filter
- Bilibino (2) Apply Bilibino filter
Contract information field: Nature
Contract information field: Method of procurement
Background
1) Background
Project Background
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme” it was decided to deliver training equipment for the personnel of the Aktau NPP (BN-350, fast breeder). The equipment covers the following items:
Objectives
Objectives
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme”, it was decided to improve the passive fire protection facilities of the BN-350 NPP (fast breeder) in Aktau, Kazakhstan. The project was divided into three lots:
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme” it was decided to provide technical assistance and hardware for the radiological characterisation and monitoring of the Aktau NPP (BN-350, fast breeder). The project covered the following lots: