Objective
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- Areva (8) Apply Areva filter
- Belgatom (3) Apply Belgatom filter
- Empresarios Agrupados (3) Apply Empresarios Agrupados filter
- Tecnatom (3) Apply Tecnatom filter
- ATOS ORIGIN BELGIUM SA (2) Apply ATOS ORIGIN BELGIUM SA filter
- Magnox Electric (2) Apply Magnox Electric filter
- AEP (Atomenergoproekt) (1) Apply AEP (Atomenergoproekt) filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Ansaldo STS (1) Apply Ansaldo STS filter
- BERRY (1) Apply BERRY filter
- Crown Agents (1) Apply Crown Agents filter
- EDF (Electricite de France) (1) Apply EDF (Electricite de France) filter
- Enel (1) Apply Enel filter
- Enprima Engineering Oy (1) Apply Enprima Engineering Oy filter
- EWN (Energiewerke Nord) (1) Apply EWN (Energiewerke Nord) filter
- Framatome (1) Apply Framatome filter
- Gea Wenutec (1) Apply Gea Wenutec filter
- Iberdrola (1) Apply Iberdrola filter
- National Nuclear Corporation (1) Apply National Nuclear Corporation filter
- Nukem (1) Apply Nukem filter
- SGN (Societe generale pour les techniques nouvelles) (1) Apply SGN (Societe generale pour les techniques nouvelles) filter
- TES (1) Apply TES filter
Contract information field: Sector
- DS - Design safety (incl. Off-Site Emergency Preparedness) (30) Apply DS - Design safety (incl. Off-Site Emergency Preparedness) filter
- WDS - Waste, Decommissioning and Safeguards (2) Apply WDS - Waste, Decommissioning and Safeguards filter
- RA - Regulatory Authorities (1) Apply RA - Regulatory Authorities filter
Contract information field: Types of activities
- Design safety (28) Apply Design safety filter
- Equipment Supply (2) Apply Equipment Supply filter
- On Site Assistance (2) Apply On Site Assistance filter
- Fuel Cycle (1) Apply Fuel Cycle filter
- Probabilistic Safety Analysis (1) Apply Probabilistic Safety Analysis filter
- RBMK studies (1) Apply RBMK studies filter
- Studies (1) Apply Studies filter
- Training (1) Apply Training filter
Contract information field: Partner (Beneficiary)
- (-) Remove Rosenergoatom filter Rosenergoatom (37)
- (-) Remove State Scientific Center of Russian Federation "Institute of Theoretical and Experimental Physics" filter State Scientific Center of Russian Federation "Institute of Theoretical and Experimental Physics" (0)
- Armenian Nuclear Power Plant (5) Apply Armenian Nuclear Power Plant filter
- EnergoAtom (4) Apply EnergoAtom filter
- GOSKOMATOM (4) Apply GOSKOMATOM filter
- MINATOM RF, later ROSATOM (since 12/2007) (3) Apply MINATOM RF, later ROSATOM (since 12/2007) filter
- Government of Armenia (1) Apply Government of Armenia filter
- Jordan Nuclear Regulatory Commission (JNRC) (1) Apply Jordan Nuclear Regulatory Commission (JNRC) filter
- Kiev Institute Energoproject (1) Apply Kiev Institute Energoproject filter
- Ministry of Emergencies of Ukraine (1) Apply Ministry of Emergencies of Ukraine filter
- Ministry of Environmental Protection of Ukraine (1) Apply Ministry of Environmental Protection of Ukraine filter
- Ministry of Fuel and Energy of Ukraine (1) Apply Ministry of Fuel and Energy of Ukraine filter
- Nuclear Regulatory Administration (NRA) of Ukraine (1) Apply Nuclear Regulatory Administration (NRA) of Ukraine filter
- Rostechnadzor (1) Apply Rostechnadzor filter
- Sevastopol Institute of Nuclear Energy and Industry (SINEI) (1) Apply Sevastopol Institute of Nuclear Energy and Industry (SINEI) filter
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
- (-) Remove Restricted Call for Tender filter Restricted Call for Tender (37)
- Special Fund (Procurement Agent) (99) Apply Special Fund (Procurement Agent) filter
- Direct Agreement (58) Apply Direct Agreement filter
- Open Call for Tender (19) Apply Open Call for Tender filter
- Negotiated Procedure (5) Apply Negotiated Procedure filter
- Informal Consultation (2) Apply Informal Consultation filter
- Competitive Dialogue (1) Apply Competitive Dialogue filter
Objective
The waste centre (for both NPP and non-NPP radwaste) includes:
Objective
The objective of the project was to develop a complete and coherent Quality Assurance (QA) Program for operation of Russian NPPs in order to improve as quickly as possible the operating safety of these plants.
Result (General)
Kola 1&2 - Novovoronezh 3&4
REPORTS
1 Progress Report 1st Quarterly Report 25/02/1994
2 Progress Report 2nd Quarterly Report 25/05/1994
3 Progress Report 3rd Quarterly Report 6/10/1994
4 Progress Report 4th Quarterly Report 13/01/1995
Objective
Project Background
Background
Introduction
Objective
Objective
Objective
In the existing fuel loading machines Instrumentation and Control errors in fuel positioning occurred and due to malfunction of the electronics all limiting blockings could run out of function.
Objective
The project aimed at creating an industrial Fatigue Monitoring System developing the following tasks:
Objective
Background
Objective
Objective
Objective
The overall project aimed to develop and deliver simulation tools to be installed on the VVER-440-NPP sites (230/213). Multifunctional Simulators (MFS) had to be supplied and delivered to Novoronezh Training Centre and Kola NPP.
Objective
Objective
Some Reference Documents indicated the tendency to unstable behaviour of VVER-1000 reactor cores (e.g. Xe oscillations).
Objective
Mainly for application in the primary loop, VNIIAES has developed a diagnostic centre for: