1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- EDF (Electricite de France) (7) Apply EDF (Electricite de France) filter
- Bopp & Reuther (2) Apply Bopp & Reuther filter
- Framatome (2) Apply Framatome filter
- SEBIM (2) Apply SEBIM filter
- Alstom (1) Apply Alstom filter
- Babcock Sempell (1) Apply Babcock Sempell filter
- ENVINET (1) Apply ENVINET filter
- Herion (1) Apply Herion filter
- Intercontrole (1) Apply Intercontrole filter
- Lisega (1) Apply Lisega filter
- Onet Technologies (1) Apply Onet Technologies filter
- Persta (1) Apply Persta filter
- Rados (1) Apply Rados filter
- RE (Rheinisch-Westfälisches Elektrizitätswerk) (1) Apply RE (Rheinisch-Westfälisches Elektrizitätswerk) filter
- Syseca (1) Apply Syseca filter
- Weir Valves & Controls (1) Apply Weir Valves & Controls filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
- (-) Remove EnergoAtom filter EnergoAtom (25)
- (-) Remove State Scientific Center of Russian Federation "Institute of Theoretical and Experimental Physics" filter State Scientific Center of Russian Federation "Institute of Theoretical and Experimental Physics" (0)
- GAN (Ukraine) (1) Apply GAN (Ukraine) filter
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.
1) Background
1) Background
ROVNO NPP (RNPP) is composed of three reactors in operation (2 WWER 440/213 and 1 WWER 1000/320) and one (WWER 1000/320) in commissioning phase.
1) Background
The safety assessment of the plant operational and maintenance practices identified missing data acquisition system that performs data processing, analysis and inspection report writing of the eddy current inspection of the VVER steam generator tubes.
1) Background
Previous SG (steam generator) safety valves experienced several design shortcomings:
Beneficiary Organisation: Energoatom - NAEK (beneficiary) and Rovno NPP (end user)
1) Background
Beneficiary organisation: Energoatom, Ukraine
1) Background
Rovno NPP unit 3 is equipped with some foreign made piston shock absorbers. Due to difficult economic conditions, it was difficult to Rovno NPP to procure relevant spare parts and to implement adequate maintenance.
1) Background
In the framework of the Tacis 1994-95 programmes, the European Commission has agreed with the Ukrainian Goskomatom on the project of replacement of the Computer Information System (CIS) at Rovno NPP, Unit 1 & 2.
2) Objectives
Beneficiary organisation: Energoatom, Ukraine
1) Background
Previous SG (steam generator) safety valves experienced several design shortcomings:
Beneficiary Organisation: RNPP
1) Background
1) Background
1) Background
Background
U1.01/98 & U1.01/98A
Objectives
The present TACIS project U1.01/95C aims at replacing the 12 SG (steam generator) safety valves (2 per SG) of each unit 1 and unit 2 of Rovno NPP. The new safety valves should have the following functions:
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Rovno NPP.
1) Background