Overall objective(s):
The completion and safety upgrading of Rovno-4 and Khmelnitskiy-2 units.
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- (-) Remove 1996 filter 1996 (29)
Contract information field: Status
Contract information field: Contractor
- EDF (Electricite de France) (4) Apply EDF (Electricite de France) filter
- Tecnatom (4) Apply Tecnatom filter
- Areva (3) Apply Areva filter
- ATOS ORIGIN BELGIUM SA (2) Apply ATOS ORIGIN BELGIUM SA filter
- Belgatom (2) Apply Belgatom filter
- CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH (2) Apply CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH filter
- National Nuclear Corporation (2) Apply National Nuclear Corporation filter
- ABB (Asea Brown Boveri) (1) Apply ABB (Asea Brown Boveri) filter
- AEP (Atomenergoproekt) (1) Apply AEP (Atomenergoproekt) filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- ENCO - Enconet (1) Apply ENCO - Enconet filter
- EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM (1) Apply EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM filter
- EWN (Energiewerke Nord) (1) Apply EWN (Energiewerke Nord) filter
- Luxconsult (1) Apply Luxconsult filter
- Magnox Electric (1) Apply Magnox Electric filter
- Siemens (1) Apply Siemens filter
- STUK (Sateilyturvakeskus) (1) Apply STUK (Sateilyturvakeskus) filter
Contract information field: Sector
- (-) Remove DS - Design safety (incl. Off-Site Emergency Preparedness) filter DS - Design safety (incl. Off-Site Emergency Preparedness) (29)
- HI - Horizontal Issues (22) Apply HI - Horizontal Issues filter
- WDS - Waste, Decommissioning and Safeguards (18) Apply WDS - Waste, Decommissioning and Safeguards filter
- RA - Regulatory Authorities (12) Apply RA - Regulatory Authorities filter
- EXT - not Nuclear Safety (1) Apply EXT - not Nuclear Safety filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Background
This second contract was placed to extend the scope of the project U2.05/94 (see 23160 for a description of the first contract).
Objective
Objective
When assessing the NPPs operation safety level, one of the major elements is the residual lifetime of equipment and components. Continuous operation of the NPPs for power generation leads mainly to:
Brief project history
Objective
Objective
The training programme for the management of the NPPs/Nuclear Facilities included:
Objective
The project aim is to implement an expertise methodology on a pilot NPP in order to evaluate the status of the electrical cabling and residual lifetime.
Following related activities are to be performed:
Objective
The Project is based on the use of Western technology, software and hardware received in the frame of TACIS 91 - 1.3. Project Accident analysis.
The objectives were:
Objectives
Objective
The present project was proposed as a result of the Brainstorming meeting held at Garching (Germany) February 2 and 3, 1995 and in full consideration of the safety relevance of the RPV integrity issue.
Objective
The structural integrity of RBMK fuel channels and their interaction with the Graphite blocks governs the safe lifetime of the reactor core.
Background
Objectives
The main objectives of the project were:
Objective
The Quality Assurance (QA) system development programme, started under TACIS 3.2/91 and continued under R2.10/93, has been completed. As a result of these projects a first series of 10 procedures was developed with VNIIAES and Novovoronezh NPP.
Objectives
Background
Project Background
Background
Background and Project Aims