Objectives:
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2007 (1) Apply 2007 filter
- 2006 (3) Apply 2006 filter
- 2005 (6) Apply 2005 filter
- 2004 (3) Apply 2004 filter
- 2003 (12) Apply 2003 filter
- 2002 (9) Apply 2002 filter
- 2001 (3) Apply 2001 filter
- (-) Remove 2000 filter 2000 (18)
- 1999 (2) Apply 1999 filter
- 1998 (2) Apply 1998 filter
- 1997 (13) Apply 1997 filter
- (-) Remove 1996 filter 1996 (18)
- 1995 (22) Apply 1995 filter
- 1994 (24) Apply 1994 filter
- 1993 (17) Apply 1993 filter
- 1992 (11) Apply 1992 filter
- 1991 (35) Apply 1991 filter
- 1990 (3) Apply 1990 filter
Contract information field: Status
Contract information field: Contractor
- Areva (3) Apply Areva filter
- EDF (Electricite de France) (3) Apply EDF (Electricite de France) filter
- Tecnatom (2) Apply Tecnatom filter
- ABB (Asea Brown Boveri) (1) Apply ABB (Asea Brown Boveri) filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Belgatom (1) Apply Belgatom filter
- EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM (1) Apply EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM filter
- EWN (Energiewerke Nord) (1) Apply EWN (Energiewerke Nord) filter
- Initec Energia (1) Apply Initec Energia filter
- JRC (Joint Research Centre - European Commission) (1) Apply JRC (Joint Research Centre - European Commission) filter
- Magnox Electric (1) Apply Magnox Electric filter
- National Nuclear Corporation (1) Apply National Nuclear Corporation filter
- Siemens (1) Apply Siemens filter
- WS ATKINS (1) Apply WS ATKINS filter
Contract information field: Sector
Contract information field: Types of activities
- (-) Remove Design safety filter Design safety (18)
- Equipment Supply (79) Apply Equipment Supply filter
- On Site Assistance (30) Apply On Site Assistance filter
- Technical Support Organisations (18) Apply Technical Support Organisations filter
- Training (8) Apply Training filter
- Euratom Loan Preparation (7) Apply Euratom Loan Preparation filter
- Safeguards (6) Apply Safeguards filter
- Waste Management (6) Apply Waste Management filter
- Emergency Preparedness (3) Apply Emergency Preparedness filter
- Regulatory Authorities (3) Apply Regulatory Authorities filter
- Mitigation of Chernobyl accident (2) Apply Mitigation of Chernobyl accident filter
- Technical expertise (2) Apply Technical expertise filter
- Decommissioning (1) Apply Decommissioning filter
- RBMK studies (1) Apply RBMK studies filter
- Studies (1) Apply Studies filter
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Objective
Objective
When assessing the NPPs operation safety level, one of the major elements is the residual lifetime of equipment and components. Continuous operation of the NPPs for power generation leads mainly to:
Brief project history
Objective
Objective
The project aim is to implement an expertise methodology on a pilot NPP in order to evaluate the status of the electrical cabling and residual lifetime.
Following related activities are to be performed:
Objective
The Project is based on the use of Western technology, software and hardware received in the frame of TACIS 91 - 1.3. Project Accident analysis.
The objectives were:
Objectives
Objective
The present project was proposed as a result of the Brainstorming meeting held at Garching (Germany) February 2 and 3, 1995 and in full consideration of the safety relevance of the RPV integrity issue.
Objectives
The main objectives of the project were:
Objective
The Quality Assurance (QA) system development programme, started under TACIS 3.2/91 and continued under R2.10/93, has been completed. As a result of these projects a first series of 10 procedures was developed with VNIIAES and Novovoronezh NPP.
Objectives
Objectives
Beneficiary Ornganisation Details
Kozloduy NPP: http://www.kznpp.org
Project Aims
Overall objective(s):
The completion and safety upgrading of Rovno-4 and Khmelnitskiy-2 units.
see contract 25862 for detailed information
1) Background Ukrainian government was always considering completion and upgrading of 2 VVER units: Rovno-4 and Khmelnitsky-2 (R4K2), whose construction was stopped in the late 80’s.
See contract 25862 for detailed information