Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2013 (1) Apply 2013 filter
- 2011 (1) Apply 2011 filter
- 2008 (1) Apply 2008 filter
- 2007 (1) Apply 2007 filter
- 2006 (3) Apply 2006 filter
- 2005 (9) Apply 2005 filter
- 2004 (5) Apply 2004 filter
- 2003 (11) Apply 2003 filter
- 2002 (7) Apply 2002 filter
- 2000 (7) Apply 2000 filter
- 1999 (2) Apply 1999 filter
- 1998 (2) Apply 1998 filter
- 1997 (10) Apply 1997 filter
- (-) Remove 1996 filter 1996 (29)
- 1995 (13) Apply 1995 filter
- 1994 (33) Apply 1994 filter
- 1993 (24) Apply 1993 filter
- 1992 (10) Apply 1992 filter
- 1991 (28) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- EDF (Electricite de France) (4) Apply EDF (Electricite de France) filter
- Tecnatom (4) Apply Tecnatom filter
- Areva (3) Apply Areva filter
- ATOS ORIGIN BELGIUM SA (2) Apply ATOS ORIGIN BELGIUM SA filter
- Belgatom (2) Apply Belgatom filter
- CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH (2) Apply CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH filter
- National Nuclear Corporation (2) Apply National Nuclear Corporation filter
- ABB (Asea Brown Boveri) (1) Apply ABB (Asea Brown Boveri) filter
- AEP (Atomenergoproekt) (1) Apply AEP (Atomenergoproekt) filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- ENCO - Enconet (1) Apply ENCO - Enconet filter
- EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM (1) Apply EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM filter
- EWN (Energiewerke Nord) (1) Apply EWN (Energiewerke Nord) filter
- Luxconsult (1) Apply Luxconsult filter
- Magnox Electric (1) Apply Magnox Electric filter
- Siemens (1) Apply Siemens filter
- STUK (Sateilyturvakeskus) (1) Apply STUK (Sateilyturvakeskus) filter
Contract information field: Sector
- (-) Remove DS - Design safety (incl. Off-Site Emergency Preparedness) filter DS - Design safety (incl. Off-Site Emergency Preparedness) (29)
- HI - Horizontal Issues (22) Apply HI - Horizontal Issues filter
- WDS - Waste, Decommissioning and Safeguards (18) Apply WDS - Waste, Decommissioning and Safeguards filter
- RA - Regulatory Authorities (12) Apply RA - Regulatory Authorities filter
- EXT - not Nuclear Safety (1) Apply EXT - not Nuclear Safety filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Project Background
Background
Background and Project Aims
Background
Objectives:
Background
Objective
Background
A tender evaluation committee was organised to evaluate the tenders for the project U2.04/96. The Evaluation Committee consisted of:
• a Chairman (DG IA), the Task Manager (DG IA) and a secretary (Tacis PU),
1) Background
The working plan and budget of the NNEGC-ENERGOATOM (EA) for the year 2000 defined training and continuing education of the managers and of the manager successors. However, fulfilment of these plans proved to be complicated due to the following reasons:
1) Background
Reliability of valves used for controlling the essential systems is a major element influencing the operational safety of NPPs. Operating NPPs in Ukraine contain approximately 5000 foreign-made valves of Western European supply.
Project Background
Background
This second contract was placed to extend the scope of the project U2.05/94 (see 23160 for a description of the first contract).
Objective
Objective
When assessing the NPPs operation safety level, one of the major elements is the residual lifetime of equipment and components. Continuous operation of the NPPs for power generation leads mainly to:
Brief project history
Objective
Objective
The training programme for the management of the NPPs/Nuclear Facilities included:
Objective
The project aim is to implement an expertise methodology on a pilot NPP in order to evaluate the status of the electrical cabling and residual lifetime.
Following related activities are to be performed:
Objective
The Project is based on the use of Western technology, software and hardware received in the frame of TACIS 91 - 1.3. Project Accident analysis.
The objectives were: