Objective
Search
3 results recovered
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
Contract information field: Sector
Contract information field: Types of activities
- (-) Remove Training filter Training (2)
- (-) Remove Fuel Cycle filter Fuel Cycle (1)
- Equipment Supply (118) Apply Equipment Supply filter
- On Site Assistance (52) Apply On Site Assistance filter
- Design safety (39) Apply Design safety filter
- RBMK studies (2) Apply RBMK studies filter
- Probabilistic Safety Analysis (1) Apply Probabilistic Safety Analysis filter
- Studies (1) Apply Studies filter
Contract information field: Partner (Beneficiary)
- (-) Remove Rosenergoatom filter Rosenergoatom (3)
- GOSKOMATOM (2) Apply GOSKOMATOM filter
- MINATOM RF, later ROSATOM (since 12/2007) (2) Apply MINATOM RF, later ROSATOM (since 12/2007) filter
- Administration of the Exclusion Zone SSE “Technocentre” (1) Apply Administration of the Exclusion Zone SSE “Technocentre” filter
- Armenian Nuclear Power Plant (1) Apply Armenian Nuclear Power Plant filter
- EnergoAtom (1) Apply EnergoAtom filter
- GAN (Ukraine) (1) Apply GAN (Ukraine) filter
- Sevastopol Institute of Nuclear Energy and Industry (SINEI) (1) Apply Sevastopol Institute of Nuclear Energy and Industry (SINEI) filter
Contract information field: Installation Types
Contract information field: Nature
Contract information field: Method of procurement
Countries:
Russia
Programme:
TACIS
Budget year:
1994
Amount:
€ 483.622,61
Countries:
Russia
Programme:
TACIS
Budget year:
1995
Amount:
€ 1.627.140,47
This contract, signed in September 1997, included two separate projects of the TACIS 1995 programme.
Project R5.01/95: Establishment of the Russian Methodology and Training Centre (RMTC), Phase 3
Background
Countries:
Russia
Programme:
TACIS
Budget year:
1995
Amount:
€ 887.027,36
Objective