Objective R1.01/93
This On-Site-Assistance, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Navigation path
Objective R1.01/93
This On-Site-Assistance, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases the OSA was performed by an EU utility, working with a team of Western and Russian experts.
R1.05/94
Objective
This contract, signed in September 1997, included two separate projects of the TACIS 1995 programme.
Project R5.01/95: Establishment of the Russian Methodology and Training Centre (RMTC), Phase 3
Background
Project background
Project background
Objective
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 95 with the same Western and Eastern Utilities and NPPs.
Objective R1.02/93
This “On-Site-Assistance”, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases, the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Objective R1.03/93
This “On-Site-Assistance”, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases, the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Background
The project intended to implement at Kalinin Unit 2 (VVER 1000 type) a system allowing for diagnostic and monitoring of small leaks in equipment and piping of primary coolant circuit pressure boundary located inside the reactor containment.
Introduction
Objective
Objectives
Objective
The project includes procurement of special maintenance equipment for large scale repair and replacement of heavy components like steam generators, pipes and valves.
The envisaged tools and equipment include:
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/96A and jointly tendered, contracted and supplied.
Background
Objective
Objective
Objective