Objective (phase 2)
The objective of this project was to continue the work started in a first phase under the same project number. This project is to be seen as a contractual extension of the previous one with the same number R1.06/7/92.
Result
Navigation path
Objective (phase 2)
The objective of this project was to continue the work started in a first phase under the same project number. This project is to be seen as a contractual extension of the previous one with the same number R1.06/7/92.
Result
Objective
Objective
The project’s objective covered research, design, supply and commissioning of:
Objective
On request of the Beneficiary a simulator (see Project R1.06/93) was provided for instruction and proficiency training of operator teams to improve their skills and knowledge to operate the BN 600 NPP at Beloyarsk.
Project Description
Objectives
Objective
Objective
Objective
A simulator was to be provided for instruction and proficiency training of operator teams to improve their skills and knowledge.
The simulator had to provide the following types of training:
Objective
Objective
The aim of the project is the refurbishment of the present Process Monitoring System (PMS) with full consideration of the possibility to operate with PMS functions in the present as well as in the new system.
Background
Objective
Objective
The objective of the project is to equip the BN 600 NPP with hardware, software and procedures for thermal visual inspection of the high voltage equipment for timely prevention of the accidents at the BN 600 NPP.
Beloyarsk Process Monitoring System (see projects R1.06/95E and R1.06/96B)
Objective
Objective
Objectives
Background
Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.